Once a year, someone signs a page that says the operating procedures are current and accurate. At a lot of plants the signature is real and the comparison is not. Nobody opened the procedures against the changes from the past year, the drawings, or the equipment.
The sentence in the rule
29 CFR 1910.119(f)(3) says the operating procedures shall be reviewed as often as necessary to assure that they reflect current operating practice, including changes that result from changes in process chemicals, technology, and equipment, and changes to facilities. The employer shall certify annually that these operating procedures are current and accurate.
40 CFR 68.69(c) uses the same structure for a Program 3 process. The owner or operator reviews as often as necessary, including changes to the stationary source, and certifies annually that the operating procedures are current and accurate.
Two duties sit in one paragraph. Review as often as necessary is the duty to keep the page aligned with practice when practice changes. The annual certification is the point when the employer, or the owner or operator, states that the set is current and accurate. OSHA does not publish a required form for that statement in this section. EPA does not either. A twelve-page routing slip does not add a regulatory element. Skipping the comparison does.
The certification is the facility's act. I can gather the changes, walk the steps, and mark up the drafts. I do not certify the procedures for the employer, and I do not certify the process.
What to compare
Current means the page describes the process as it is operated now. Accurate means the steps, the limits, and the equipment names match the process safety information and the plant. A freshly reprinted procedure can still be wrong if the reprint kept an old setpoint.
A review that can support those words has a short list. None of it is exotic.
Name every operating procedure that covers a regulated process, and the phase each one claims to cover: initial startup, normal operations, temporary operations, emergency shutdown, emergency operations, normal shutdown, and startup after a turnaround or an emergency shutdown. A signature on the procedures you have does not fill a missing phase.
Pull the management-of-change records since the last certification. 29 CFR 1910.119(l) already requires modifications to operating procedures to be addressed before a change, and requires the procedures to be updated if the change affects them. The annual review is where you find the changes that never made it back into the text. If a valve, a transmitter, or a chemical strength changed and the procedure still describes the old plant, the procedure is not current.
Check the limits in the procedure against the PSI. Check equipment names against the drawings the operators use. Where they do not match, correct one of them before anyone signs.
Walk a defined sample at the equipment. Read the step there. Check that the operator can see the indication the step names, that the limit is the number on the gage or the screen they use, and that the emergency-shutdown step names the conditions and the qualified operators responsible. You will not walk every line of every procedure every year unless the set is small. Decide, in writing, which procedures and which phases get the field check this year, and why. A defined sample is a review. An unread stack is not.
Stop routing a form nobody can read
The chase looks like this. A coordinator builds a matrix of procedure numbers and sends it for signature. Reviewers sign because the alternative is an overdue item. Nobody is handed the redlines, the MOC list, or a marked-up P&ID. The signed matrix goes in the file. The procedures stay as they were.
Give reviewers the documents they are being asked to stand behind. Tie "reviewed" to a comparison. The requirement is the employer's certification that the procedures are current and accurate. The number of signatures is not the requirement.
Keep a record of what was compared: the procedure list, the changes considered, the PSI and drawings used, the steps walked, and the corrections made before the certification was signed. That record is what makes the sentence true. It is also what you will want a year later, when someone asks what the certification was based on.
The rest of the year
The annual date is not a reason to save every edit for December. If a change affects how the process is operated, update the procedure as part of the change, under 1910.119(l)(5) and the review duty in (f)(3). The annual certification then confirms the set, including those updates. A plant that saves every edit for the certification month is running most of the year on pages the shift already knows are wrong. Operators notice. They stop using the book.
Changes hit the procedures when the changes happen. The annual pass confirms the phases are still covered, the limits still match the PSI, and a sample of steps still matches the field. Someone with authority at the facility signs that this is so.