Insights

Turning tribal knowledge and walkdown notes into usable SOPs

The best draft of a procedure does not start at a keyboard. It starts at the equipment, with the person who runs it, in the order they actually do the work. That knowledge is often called tribal because it was never written down, or because the writing drifted away from it. Tribal is not an insult. It is a description of where the accurate sequence currently lives. The job of the procedure is to move that sequence onto a page, and to check it against the process safety information, without sanding off the parts that keep people safe.

29 CFR 1910.119(f) and, for a Program 3 process, 40 CFR 68.69 both require clear instructions consistent with the process safety information. Operator memory is a source for the order of work. It is not a source for an operating limit that the PSI does not support. Both halves of that sentence matter.

What to capture on the walkdown

Walk the job. Do not interview someone about the job in a conference room and call that a walkdown. At the equipment, write what the operator does, in order, in their words first. Clean the sentences later. If you clean them during the walk, you will substitute your vocabulary for the label on the valve.

For each action, capture five things when they exist.

The action itself, aimed at a named component. "Open the inlet" is not enough if three inlets are in reach. Use the label the operator uses, then check it against the drawing.

The indication that the action worked. A gage, a light, a sound, a level, a flow. If the operator says "you'll know," ask what they look at. If they cannot point to an indication, the step is not yet writable.

The limit, if this action depends on one. Write the number they state, and write where they believe it comes from. You will compare it to the PSI later. Do not "correct" it in the notebook to match what you hope the PSI says.

The consequence they are avoiding. Operators often state this more clearly than engineers do. "If you open that with the discharge shut, you deadhead the pump." Keep the sentence. It is the consequence of deviation, which the rule requires, said in the language of the work.

The safety system that has to be in a given state. Scrubber running, detector in service, blind in place, permissive made. If they check it, it belongs on the step. If they are supposed to check it and do not, that disagreement is a finding, not a sentence to omit so the draft looks smooth.

Also mark the phase. A walkdown of a routine start does not document emergency shutdown, temporary container changes, or startup after a turnaround. Those are separate walks, or the procedure set will silently drop the phases in 1910.119(f)(1)(i) and 68.69(a)(1).

Where tribal knowledge stops being the authority

After the walk, lay the notes next to the process safety information, the piping and instrumentation drawings, and any procedure you already have. You are looking for conflicts, not for confirmation.

Three conflicts show up constantly.

The order in the notes is safe and the old procedure is not. Prefer the order the operator demonstrated, if it is consistent with the PSI and the drawing. Update the procedure. That is the procedure reflecting current practice, which 1910.119(f)(3) requires.

The limit in the notes does not match the PSI. Do not average them. Do not pick the one that is easier to remember. Find out which one is the limit the facility intends to operate within, correct the wrong source, and write that number. A walkdown note is not a license to operate outside the safe limit in the PSI. A PSI number nobody can find on a gage is not a limit the operator can use. Fix the instrument label or the text so they meet.

The notes describe a lineup the drawing does not show. Either the drawing is behind the plant, or the lineup is an unofficial change. 1910.119(l) is how changes to equipment and to procedures are supposed to be managed, including updates to the operating procedures when the change affects them. Writing the unofficial lineup into a new SOP, with no change record, launders a change that never went through the process. Say so. Do not bury it in clean prose.

From notes to one format

Notes are not a procedure. They are out of order in places, they use three names for one valve, and they skip the indication the operator gestured at because you were writing. The draft turns them into one format: numbered steps, in the order of the work, with the limit, the consequence, and the corrective step on the step that needs them, and the safety system named where its state matters.

A consistent format is not decoration. It is how the second procedure and the twentieth can be checked the same way. It is also how an operator who learned one unit can read another without relearning the writer's habits.

Drafting can be assisted by software, including tools that turn structured notes into a first draft. That assistance does not know your limits. If the note did not contain a limit, the draft must not grow one. If the note conflicted with the PSI, the draft must show the conflict, not resolve it by sounding confident. The person responsible for the draft checks every limit against the PSI before anyone calls the page a procedure.

Walk the draft, then let the facility approve it

Take the draft back to the equipment with the operators who did not write it, if you can. A second pair of eyes catches the step that made sense in the notebook and does not match the knob in the panel. Read the step aloud. Perform it only as the facility's rules allow. The point is to find the step that cannot be followed as written.

Comments from that walk go into the draft before approval. Approval stays with the facility's subject-matter experts. They are the approvers of record. A procedure that operators have not walked is still tribal knowledge, with better formatting. A procedure they have walked, that matches the PSI, is something the shift can be asked to follow.

Keep the notes. They are the record of what was seen and what conflicted. When the annual certification asks whether the procedures are current and accurate, the notes, the change records, and the draft history are how you answer without starting the walkdown over from a blank page.

Greg Prichard is the principal of Critical Path Procedures LLC. He writes operating procedures for water, wastewater, and chemical facilities. The facility's own experts approve the procedures, and the facility performs its own annual certification. This article is general information, not legal advice.